Home/Answers/Structure
METAL ROOF COST LAB / Structure

Fixing a Failed Structure Task

If Structure fails, try another file/format, unlock the file, reduce batch size, then update the tool/browser.

Updated 2026-11-01About 3 minLocal test
Quick answer

If Structure fails, try another file/format, unlock the file, reduce batch size, then update the tool/browser. Structure/purlins/load affect install.

Why it matters

Most failures are input/lock/resource issues, not the tool itself.

Purlins.

Step by step

  1. Check material/area/slope/structure/climate/old roof.
  2. Separate materials/labor/trim/removal/insulation.
  3. Get 2-3 quotes; confirm material/thickness/warranty.
  4. Contract states scope/removal/payment/warranty.

Common mistakes

  • Unit price only, not thickness/trim.
  • Ignoring slope/structure/removal.
  • Not checking warranty/coating.
  • No payment/color terms.

Checklist

  • Material/area/slope/structure/climate.
  • Materials/labor/trim/removal/insulation.
  • Permits/old roof/color/coating.
  • Warranty/payment/contract.
  • Budget/maintenance/ROI.

Key facts

  • Purlins.
  • Load.
  • Install.

FAQ

How do I fix a failed Structure task?

If Structure fails, try another file/format, unlock the file, reduce batch size, then update the tool/browser. Structure/purlins/load affect install.

How long does it take?

Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.

Is data uploaded?

Runs locally and does not upload video/audio; extensions may still read the page.

Source: MRA