Quick answer
Before Contractor, back up the original, confirm format/size/quality requirements and close programs that lock the file. Credentials/insurance/portfolio/warranty.
Why it matters
Poor preparation leads to overwrites, failures and rework.
Credentials.
Step by step
- Check material/area/slope/structure/climate/old roof.
- Separate materials/labor/trim/removal/insulation.
- Get 2-3 quotes; confirm material/thickness/warranty.
- Contract states scope/removal/payment/warranty.
Common mistakes
- Unit price only, not thickness/trim.
- Ignoring slope/structure/removal.
- Not checking warranty/coating.
- No payment/color terms.
Checklist
- Material/area/slope/structure/climate.
- Materials/labor/trim/removal/insulation.
- Permits/old roof/color/coating.
- Warranty/payment/contract.
- Budget/maintenance/ROI.
Key facts
- Credentials.
- Insurance.
- Portfolio.
FAQ
How should I prepare before Contractor?
Before Contractor, back up the original, confirm format/size/quality requirements and close programs that lock the file. Credentials/insurance/portfolio/warranty.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: MRA